Skip to main content
Short course

Industrial Engineering with Method Improvement Tools in Apparel Industry

Practical industrial engineering for RMG: SMV, line balancing, method study and productivity improvement.

  • Duration9 hours
  • FormatClass Room / Online
  • Batch sizeUp to 30 Students
Industrial Engineering with Method Improvement Tools in Apparel Industry

Overview

Training duration

9 hours, classroom or online. Day batch: Friday 9:15 am to 5:15 pm. Evening batches: Friday 5:00 pm to 10:00 pm, or Sunday and Monday 9:15 pm to 11:15 pm.

Course summary

Industrial engineers find and remove waste in production. They design efficient systems that bring together people, machines, materials, information and energy to make a product or deliver a service, and they develop job evaluation and performance programs.

This course focuses on how industrial engineering works in the apparel industry, with method improvement tools you can apply on the line straight away.

Certificate

Participants who complete the training and pass the end-of-course assessment receive an LMTC certificate.

Curriculum

1 module. Select a module to see what it covers.

01 Content Learning
  • IE responsibilities in RMG sector.
  • Production, Productivity, Efficiency
  • Objectives of Line Balancing
  • Line Balancing Modern system
  • Data Bank (SMV),Thread consumption ,CPM, Man Machine Calculation
  • One pics Follow (Tools and Technic)
  • Pull and Push system
  • Modular layout
  • 3P – Pre production Process Tools and Techniques
  • Quick change over (SMED)
  • Predetermined Motion Time Systems (PMTS)
  • 7 wastage Removing technic
  • Method improvement Tools and technic
  • Andon with cutting Kanban
  • CPM, Costing SMV Calculation
  • Problem Solving and Problem Detection Tools

Your instructor

Md. Abdur Rahman Robin

Md. Abdur Rahman Robin

Lead Instructor & Course Facilitator
LMTC

Read full profile

You might also like

All short courses

Helping factories run leaner since 2022

For 4+ years, LMTC has trained professionals and guided factories in Bangladesh's RMG and manufacturing sector through lean transformation.

Our story
  • 4+ Years in operation Since June 2022
  • 17 Years of industry expertise Led by our founder
  • 14 Training programs Courses & certifications
  • 8 Consultancy services Plus a 2-year factory program